Photos house 102 Pearl Villa 5 February, 2026
Nothing wrong with the view from the bedroom
Plastering and painting
The tiles in place
This is fun
It’s starting to pick up
Bathroom 1 soon to be finished
Style studio on the photographer
Preparing for windows
A little innovation with the windows
Then there are windows and doors on the way
Finally there is a floor
Now we are waiting for the electrician
The kitchen will be nice
Sofa and TV on site
The sofa got ahead of the tenant
Curtains
Evening work, now it’s close
Here is a some updates on the area 6 October, 2025
It grows well on pearl
Missing some grass between house and pool
Nice in the evening
Common storage rooms 109 and 110
Roof over the fish pond
A lot has happened since last time 29 September, 2025
Then the piping begins
Nothing wrong with the view from the bedroom
When the roof is ready, we start plastering the walls
Piping completed
Soon there will be roof tiles
Let’s start with the walls
Roof tiles in the works
It will be close to the pool
The posts are ready and the roof is in place 11 August, 2025
We work our way up
Approaching casting the slab
Casting the Slab
Things are going well now
Then we have started with the roof of house 102
Then the posts will be ready soon
Picture from the street of house 102
Now it’s close for houses 109 and 110 7 August, 2025
View from the office on house 109
Common storage for house 109 and 110
The last 2-3 weeks we have been focusing on the walkways inside Pearl Villa 15 July, 2025
Some pictures of our walkway
From house 108 to the pool
Gångväg till hus 104
House 102 Formed foundations, poured and the soil back. Now we start reinforcing the house, and preparing for pouring 13 June, 2025